About the Course
What Is SAP PP/DS?
SAP PP/DS stands for Production Planning and Detailed Scheduling. It plans production against real limits, such as a machine that can run only 16 hours a day or a changeover that takes 40 minutes. Classic MRP decides what to make and when it is needed. PP/DS also decides the order of jobs on each machine, so the plan can actually run on the shop floor.
PP/DS used to run in a separate APO system linked to ECC. In S/4HANA it is built in, often called embedded PP/DS, so there is no second system to maintain. This SAP PPDS training teaches the embedded version on S/4HANA, which is what most new projects use.
What You Can Do After This Course
- Mark materials, plants and work centers for advanced planning.
- Create production data structures from routings and bills of material.
- Run heuristics for make-to-stock and make-to-order products.
- Schedule orders against finite capacity on bottleneck resources.
- Define changeover times and sequence orders to save setup time.
- Use the planning board to move, split and reschedule orders.
- Read the alert monitor and fix shortages and overloads.
- Combine a PP/DS run with MRP Live in one planning cycle.
MRP or PP/DS: Which Does a Plant Need?
| Point | Classic MRP | PP/DS |
| Capacity | Assumes it is unlimited | Plans against finite capacity |
| Timing | Days | Exact time, down to minutes |
| Sequence | Not planned | Planned, with setup times |
| Best for | Simple, unconstrained lines | Bottlenecks, changeovers, tight dates |
Most plants use both. MRP Live plans the simple materials quickly, and PP/DS handles the few products that run on constrained machines.
One Week in Practice: A Paint Plant in Gujarat
Picture a paint maker near Vadodara with one mixing line that runs white, cream and grey batches. Cleaning the line after grey takes 90 minutes, but going from white to cream takes only 15. Orders for the coming week come from dealers in Ahmedabad and Surat.
The planner runs a PP/DS heuristic, which creates planned orders that respect the line's 16-hour day. A second heuristic then sequences them light to dark using the setup matrix, so the line is cleaned fully only once. When a large Surat order arrives on Wednesday, the alert monitor flags a late order, and the planner moves it on the planning board.
In the SAP PPDS training you build this plant yourself, then plan and replan its week until the schedule holds.
What a Consultant Configures in PP/DS
Setup normally starts with activating advanced planning and the planning settings for the plant. Materials, work centers and plants are then flagged for advanced planning so they move to PP/DS. Production data structures are created from routings and bills of material. Next come heuristics and planning procedures, which decide how each product is planned. Resources get their capacity and, where needed, a setup matrix. Last, the planning board layout, alert profiles and optimization profile are set so planners see what matters.
Transaction Codes and Tables
PP/DS keeps the APO-style codes, and interviewers ask for them.
| T-Code | What It Does |
| /SAPAPO/RRP3 | Product view: stock, receipts and needs for one product |
| /SAPAPO/CDPS0 | Planning board for scheduling by resource |
| /SAPAPO/CDPSB0 | Production planning run |
| /SAPAPO/AMON1 | Alert monitor |
| /SAPAPO/CDPSC11 | Maintain heuristics |
| CURTOADV_CRT | Create production data structures |
| /SAPAPO/MAT1 / RES01 | Display product / resource master |
| Table | What It Stores |
| /SAPAPO/MATKEY | Product master, general data |
| /SAPAPO/MATLOC | Product data for each location |
| /SAPAPO/LOC | Locations such as plants |
| /SAPAPO/RES_HEAD | Resource header data |
Orders themselves live in liveCache, the in-memory store PP/DS uses for fast planning, so you read them through the product view rather than a table.
Key Terms in One Line Each
- Embedded PP/DS: PP/DS running inside S/4HANA instead of a separate APO system.
- Advanced Planning flag: the setting that makes a material or work center plannable in PP/DS.
- Production data structure: the PP/DS copy of a routing and bill of material.
- Heuristic: a rule-based planning step, such as covering demand or sequencing orders.
- Finite scheduling: scheduling that never loads a resource beyond its capacity.
- Setup matrix: a table of changeover times between products.
- Planning board: a chart of resources and orders that planners change by hand.
- Alert monitor: a list of planning problems such as delays or overloads.
- Optimization: a solver that searches for the best schedule against set goals.
- liveCache: the in-memory store that holds PP/DS orders and stock.
Prerequisites for This SAP PPDS Course
Knowledge of SAP PP helps most: materials, bills of material, routings, work centers and MRP. Production planners, PP consultants and APO consultants come with most of this. Mechanical and industrial engineering graduates also do well.
You do not need coding. If your PP basics are weak, week 1 reviews them before PP/DS begins.
Week-by-Week Plan
| Week | Modules | By the End You Can |
| 1 | 1 PP/DS overview | Explain embedded PP/DS and review PP basics |
| 2 | 2 Master data | Flag materials and create data structures |
| 3 | 3 Demand, 4 Planning strategies | Run heuristics for stock and order products |
| 4 | 5 Scheduling (capacity) | Schedule against finite capacity |
| 5 | 5 Scheduling (sequencing) | Sequence orders to cut changeovers |
| 6 | 6 Alerts, 7 Integration | Fix alerts and link PP/DS with PP and MM |
| 7 | 8 Monitoring, 9 Configuration | Set up heuristics, profiles and the board |
| 8 | 10 Project | Present the Gujarat paint plant plan |
Practice System Access
You practise in an S/4HANA system with PP/DS active during classes, and every session is recorded in the student portal. Ask the team how long system access stays open after your batch.
Live Classes or Self-Study?
Free material on PP/DS is scarce, and much of it describes the older APO version. Heuristics also fail for reasons that are hard to see alone, such as a missing flag on one work center. Live SAP PPDS training gives you a trainer who checks your settings and explains each failure while it happens.
How PP/DS Fits With Other Courses
PP/DS builds on production planning, so if you are new to SAP manufacturing, start with SAP PP training. If your company still runs a separate planning system on ECC, the APO PP/DS course covers that setup.
Course Details and Fees
| Item | Details |
| Duration | 8 weeks, 2-hour live classes |
| Batches | Weekday mornings or weekends |
| Format | Live online with a trainer, every session recorded |
| Syllabus | 10 modules, ending with a plant project |
| Certificate | Zeblearn course certificate, plus exam guidance |
| Course fees | Rs 75,000, with EMI |
Not sure this course fits your background? Book a free demo class and ask the trainer.