About the Course
What Is SAP IS Mining?
IS Mining is the name people use for running a mining business on SAP. Ore comes out of the ground, gets crushed, screened and stacked, is tested for quality, and is finally weighed and shipped to a buyer. Each step has a cost, a quantity and a grade, and all three must line up in the books at month end.
Today this runs mostly on standard S/4HANA, set up the way mines need it. Materials management handles stock and stockpiles, production planning tracks crushing and processing, quality management records assays, sales and distribution handles dispatch, and finance and controlling measure cost per tonne. Specialist tools for mine planning, grade control or weighbridges usually sit beside SAP and send their numbers in. A good consultant knows where SAP ends and those tools begin.
The Project: An Iron Ore Mine in Odisha
Picture an open-cast iron ore mine in Odisha. Trucks carry run-of-mine ore from two pits to a crushing plant, where it becomes lump and fines. You set up materials for each product and record grade, such as iron content and silica, as batch characteristics. Lab assays come in through quality inspection lots and update each batch. Stock sits in heaps split by grade. A steel plant orders 20,000 tonnes of fines at a target grade; you check the stock, pick the right batches, weigh each truck at the weighbridge, and bill with a price adjusted for the grade actually delivered. At month end, a drone survey shows less ore on one stockpile than the system says, and you post the difference and explain it.
Mining Terms in Plain Words
| Term | What It Means |
| Run-of-mine (ROM) ore | Ore as it comes from the pit, before crushing |
| Grade | How much of the valuable mineral the ore holds |
| Stockpile | A heap of ore or product, often kept apart by grade |
| Assay | A lab test that measures the grade of a sample |
| Yield or recovery | How much saleable product comes out of the ore fed in |
| Survey reconciliation | Comparing book stock with measured stockpile volume |
What SAP IS Mining Training Covers
SAP IS Mining training at Zeblearn follows ore from the pit to the customer, using the S/4HANA modules mines actually rely on.
Mine Structure and Master Data
You map mines, pits and plants to SAP organisation units, create materials for ore and products, set up classification for grade characteristics, and create equipment records for haul trucks and crushers.
Production, Stock and Quality
Next you record production with yield and recovery, manage ore heaps as storage locations with batch stock, value inventory, and run inspection lots for sampling and assays. You also see how grade results decide which batch can go to which customer.
Sales, Dispatch and Cost
The final weeks cover sales orders, weighbridge-based deliveries, domestic and export shipments, grade-based price adjustment, unit cost in controlling, and profitability by mine and product.
Where SAP Stops and Mine Systems Start
This is the question clients ask most, and many courses skip it. Long-range mine design, blast planning and detailed grade control are usually done in specialist mining software. Weighbridges, lab systems and plant control systems are separate too. SAP receives their results: tonnes moved, grades measured, trucks weighed, hours run. Your job is to make sure that data arrives clean and on time, and that stock and cost in SAP match the physical mine.
Because most of the work rests on core modules, a good base matters. Our MM course covers stock and purchasing, and the QM course goes deeper into inspection and assays.
Eight Weeks at a Glance
| Week | Focus |
| 1 | The mining value chain and how SAP fits |
| 2 | Mine-to-market processes and organisation setup |
| 3 | Materials, grade characteristics and equipment |
| 4 | Production planning, yield and recovery |
| 5 | Stockpiles, batches and stock reconciliation |
| 6 | Sampling, assays and quality certificates |
| 7 | Sales, weighbridge dispatch and export |
| 8 | Unit costs, profitability, the Odisha project and interviews |
How Grade-Based Pricing Works
Mineral contracts rarely pay one flat price. A buyer agrees a base price for a target grade, then adds a bonus when the delivered ore is richer and deducts a penalty when it is poorer or carries too much of an unwanted element. In SAP, the final assay values on the delivered batches feed pricing conditions, so the invoice reflects what was really shipped. Getting this right protects revenue, and it is one of the most common topics in mining interviews.
Mistakes That Cause Month-End Trouble
Posting production by truck count instead of weighed tonnes. Keeping one heap for several grades, so batches lose their meaning. Waiting weeks to post survey differences, so the stock value drifts far from reality. Selling on target grade without a price adjustment rule. You will meet each of these in the project and learn the fix.
Is This Online Course Right for You?
SAP IS Mining training suits MM, PP, QM or SD consultants who want a mining specialism, finance and supply chain staff at mining companies, and mining or metallurgy engineers moving into ERP roles. No coding is needed. Beginners should know at least one core module, because the course builds on standard S/4HANA.
Classes are live online with a trainer and recorded, on weekday mornings or weekends. Experience at a mine, quarry or cement plant is a real advantage here. Since there is no IS Mining certification exam, that site experience plus your project carries real weight.
Course Details and Fees
| Item | Detail |
| Duration | 8 weeks of 2-hour classes |
| Modules | 8 |
| Batches | Weekday mornings or weekends |
| Format | Live online, recorded |
| Course fees | ₹75,000, EMI available |
| Certificate | Zeblearn course certificate |
Working at a mine or plant and curious where SAP fits? Book a free counselling call.